DL/T 5308—2013 水電水利工程施工安全監(jiān)測(cè)技術(shù)規(guī)范(英文版)
定 價(jià):17 元
叢書名:中華人民共和國(guó)電力行業(yè)標(biāo)準(zhǔn)
- 作者:中國(guó)電力出版社 編
- 出版時(shí)間:2020/4/1
- ISBN:9787519842901
- 出 版 社:中國(guó)電力出版社
- 中圖法分類:TV5-65
- 頁(yè)碼:29
- 紙張:膠版紙
- 版次:1
- 開本:32開
This specification is prepared in accordance with the requirements of Notice on Development and Revision of the First Batch of Energy Industry Standards in 2010 (GNKJ (2010) No.320).
During drafting this specification, the drafting team has conducted extensive researches and investigations, summarized main technical measures for construction safety monitoring of hydropower and water resources projects, and incorporated the latest research results.
This specification covers the content of safety monitoring for works including slope excavation, cofferdam, underground works,concrete dam and powerhouse and earth-rockfill dam, and processing and analysis of monitoring data.
This specification was proposed by China Electricity Council.
This specification is prepared in accordance with the requirements of Notice on Development and Revision of the First Batch of Energy Industry Standards in 2010 (GNKJ (2010)No.320).
During drafting this specification, the drafting team has conducted extensive researches and investigations, summarized main technical measures for construction safety monitoring of hydropower and water resources projects, and incorporated the latest research results.
This specification covers the content of safety monitoring for works including slope excavation, cofferdam, underground works,concrete dam and powerhouse and earth-rockfill dam, and processing and analysis ofmonitoring data.
This specification was proposed by China Electricity Council.
This specification is under the jurisdiction of the Technical Committee on Standardization of Hydropower Construction in
Electric Power Industry.
The main drafting organization ofthis specification is Sinohydro Bureau 3 Co., Ltd.
The drafting participants of this specification include China Gezhouba (Group) Corporation and Sinohydro Bureau 15 Co., Ltd.
The main drafters of this specification include Wang Pengyu, Li Lei, Ji Maixing, Xie Kaijun, Chen Guangrong, Xing Hao, Bai Meigang, Li Yongqi, Liu Weidong, Li Xiaoguang, Nan Dawei, Dong Dong, Yue Peng, Ma Jianxun, Zhou Hong, Long Zhiqiang, Guo
Qidong, Wang Yong, Peng Chengjun and Yao Hongbing.
The mam reviewers of this specification include Zhou Hougui,Mao Yajie, Wang Yi, Zheng Ping, Chu Yuexian, Kang Minghua, Chen Hong, Mei Jinyu, Wu Guoru, Zheng Guibin, Liu Yushan, Cai Qiguang, Shang Hong, Luo Weicheng, Niu Hongli, Wu Gaojian,Yang Chengwen, Wu Xu, Huang Wei, He Xiaoxiong, Tan Kaiyan,Yang Jie, Chen Xugao, Chen Shulian, Luo Lin and Yan Sanyuan.
Translated and examined by: Xu Songlin, Chu Yuexian, Liu Dongni, Chen Jiansu, Guo Jie, Li Jingshuang, Wu Guoqiang, Zhang Weichao, Cheng Zhihua, Li Yan, Peng Chengjun, and Che Zhenying.
Any opinion or suggestion proposed during the execution of this specification should be sent to the Standardization Center of China
Electricity Council at the following address: No.1, Lane 2, Baiguang
Road, Beijing, 100761.
Foreword
1 General Provisions
2 Terms
3 Slope and Excavation
3.1 GeneraI Requirements
3.2 Slope Deformation Monitoring
3.3 Slope Support Monitoring
3.4 Adverse Blast Effect Monitoring
3.5 Detecting of the Range of Rock mass Relaxation
3.6 Slope Seepage Monitoring
4 Cofferdam
4.1 General Requirements
4.2 Cofferdam Surface Deformation Monitoring
4.3 Crack Monitoring
4.4 Morutoring on Water Level and Flow Rate of Cofferdams
4.5 Hydraulics Monitoring on Overflow Cofferdam
5 Underground Works
5.1 GeneraI Requirements
5.2 Surrounding Rock Stability Monitoring
5.3 Blast Effect Monitoring
5.4 HarmfuI Gas Monitoring
6 Concrete Dam and Powerhouse
7 Earth-rockfill Dam
8 Processing and Analysis of Monitoring Data
Annex A Monitoring Items and Frequency for Cofferdam Construction
Annex B Methods and Content of Advance Geological Forecast
Explanation of Wording in this Specification
List of Quoted Standards